Challenge
Once we began demolition, it became apparent that the original house hadn’t been constructed conventionally. It revealed significant challenges that required it to be totally reengineered to fit within the new restraints.
Meet Tania and Andy, owners of our Valley Road renovation
Solution
Being engaged at a very early stage meant we could re-design and re-engineer as we went, walking our client through design and budget options throughout. We took a highly consultative approach, ensuring regular meetings with the engineer and design team to ensure the project remained on track, and that the design intent was maintained. Finishes were tailored to suit the ‘boating’ theme running through client’s home.
When we first approached Form™, we didn’t even have final plans. Initially, we were hesitant and felt uneasy about not being fully prepared.
The Form™ team didn’t flinch, and helped us navigate through this pre-build stage. Carefully and thoughtfully, they walked us through our design and budget options.
Tania and Andy
Owners of our Valley Road renovation